Quality Hill

Quality Hill

This boutique shopping mall located along Ggaba Road in Kampala has been in existence for many years and become famous for the ‘Quality Cuts’ butchery, ‘Le Chateau’ restaurant and ‘La Patisserie’ coffee shop. The mall had grown organically over the years without a formal masterplan in place; it was in acute need of an overall remodelling, streamlining circulation, improving visibility and modernising the general look.

The project was to be implemented in stages with the aim to minimise the interruption of the day-to-day business. Phase 1 comprised of the creation of a central Piazza from where, gradually, all major functions of the development will be accessed. The Piazza was paved with a combination of cobble stones and terrazzo slabs and has a water feature at its core that helps improving the micro-climate for outdoor seating.

The second phase consisted of a complete remodelling and enlargement of both the restaurant and the coffee shop and the creation of a new deco shop pavilion. Pre-fabricated timber structures were added to the front of both grass-thatched structures. For the coffee shop they create a well-visible, elevated seating terrace; for the restaurant, they help enclosing a cosy garden space that has become the centre of a completely new dining experience. The tip of one of the five original hexagon-shaped grass thatch huts in the restaurant was cut off to create a little greened-up courtyard at the heart of the restaurant.

Phase 3 – the creation of an indoor delicatessen market – and Phase 4 – the enlargement of Le Petit Village Hotel – are currently at design stage.

Location

Kampala, Uganda

Client

Sokoni Africa

Service provided

Architecture, Interior Design

Architectural team

Felix Holland with Jeroen Van Roie and Juliana Achi, Marco Cestarolli, Emma Mugisha and Sandra Mudondo

Other Consultants

Aquila Gallery (Structural Engineers), IMK Engineering (Fire Consultants), Sylsgarden (Landscape Designer)

Contractor
Gross floor area

650m²

Project status

Completed (Phases 1 and 2)

Completion date

December 2016

Quality Hill